1.施工放线,根据要求结合防尘网图纸尺寸,找出本工程相应的基础位置,用白灰洒出准确的基础位置。

1. Construction layout, according to the requirements, combined with the size of the dust-proof net drawing, find the corresponding foundation position of this project, and sprinkle the accurate foundation position with white ash.

2.土方开挖,基础土方开挖采用机械开挖,人工修正挖正负零以下2.0中间距离2m,达到设计要求,合格后再浇注C15砼垫层。

2. Earthwork excavation: Mechanical excavation is used for foundation earthwork excavation, and manual correction is carried out to a distance of 2.0 meters below plus or minus zero, meeting the design requirements. After passing the inspection, C15 concrete cushion layer is poured.

3.钢筋制作和捆扎,所有进场钢筋需具有产品质量合格证,钢筋运现场后应按批次分不同等级牌号,直径分别持牌堆放。钢筋的交叉点应用铁丝扎牢,梁和柱的扎筋应于受力钢筋垂直设置,扎筋弯钩叠合处应沿受力钢筋方向错开设置。预埋件应采用固定架固定其位置,安装符合要求以后,应于钢筋笼点焊牢固,钢筋笼要与模板固接,在基础砼浇注过程中应随时复查检控,防止浇注混凝土时产生位移。

20230426102134337.jpg

3. Steel bar production and bundling. All incoming steel bars must have a product quality certificate. After the steel bars are transported to the site, they should be classified into different grades and grades according to batches, and their diameters should be stacked with different licenses. The intersection of steel bars should be firmly tied with iron wire. The tie bars of beams and columns should be set perpendicular to the load-bearing steel bars, and the overlap of the tie bar hooks should be staggered along the direction of the load-bearing steel bars. The embedded parts should be fixed in position using a fixed frame. After installation meets the requirements, they should be spot welded firmly to the steel cage. The steel cage should be firmly connected to the template. During the pouring process of the foundation concrete, it should be checked and controlled at any time to prevent displacement during pouring.

4.支护模板:基础模板可应用木模和钢模配合使用,在土质较好的基础内,可直接将土壁削平作模,安装模板前,先复查并注出地基垫层标高和中间线的位置,弹出基础边线,每个柱子有四块模板拼钉而成,连接梁由三钢模拼装而成,模板四周要设置斜撑,是模板牢固不易变形。

4. Supporting formwork: the foundation formwork can be used in combination with wood formwork and steel formwork. In the foundation with good soil quality, the soil wall can be directly flattened as a formwork. Before installing the formwork, the elevation of the foundation cushion and the position of the middle line should be rechecked and noted, and the foundation sideline should be popped out. Each column is made of four formwork plates, and the connecting beam is made of three steel formworks. slant support should be set around the formwork, so that the formwork is firm and not easy to deform.

5.浇注混凝土:防尘网基础承台混凝土强度等级为C25,对其材料要求:水泥强度等级为325号,普通硅酸盐水泥,粗骨料围殴粒径5-20mm的卵石,细骨料为中粗砂,含泥量小于百分之3,混凝土高度为10-30mm。

5. Pouring concrete: The strength grade of the dustproof net foundation bearing platform concrete is C25, and the material requirements are as follows: cement strength grade is 325, ordinary Portland cement, coarse aggregate is mixed with pebbles with a particle size of 5-20mm, fine aggregate is medium coarse sand, with a mud content of less than 3%, and the concrete height is 10-30mm.

6.基础回填:撤模后,用干性粘土回填垒实。基础混凝土强度达到设计强度的百分之93以上后,即可进行防尘网钢结构安装。

6. Foundation backfilling: After removing the formwork, use dry clay to backfill and compact. After the strength of the foundation concrete reaches 93% or more of the design strength, the installation of the dustproof mesh steel structure can be carried out.

感谢您的阅读,此文的文章来源:山东济宁伪装网更多的内容和问题请点击: http://www.csdssc.com我们会继续努力的为您提供服务,感谢您的支持!

Thank you for reading. The source of this article is Shandong Jining Disguise Network. For more content and questions, please click: http://www.csdssc.com We will continue to work hard to provide you with services. Thank you for your support!

分类中心

Product

联系我们
山东三所新材料技术有限公司 山东三所新材料技术有限公司

联系电话:13053722248

联系地址:山东省济宁市任城区美恒济宁国际汽车博览城4号楼2单元0507号